Skip to main content

Table 7 Voyage details reported by the model (with gross profit per day objective) for each ship, at high speed

From: Shipping Optimisation Systems (SOS): tramp optimisation perspective

Ship

El Kosseir

Safaga

Sidi Kirear

Total

Voyage details

Gross profit ($)

752,534

1,145,939

3,520,082

5,418,555

Days

34.4

75.5

82.6

192.5

Gross profit/day ($)

21,877

15,178

42,616

79,671