Criteria | Description |
---|---|
Deviation time | The time taken to access a hub port after deviating from the trunk sea route. |
Vessel turnaround time | The total time a vessel spends in port for the entire operation. |
Waiting time | The amount of time that vessels have to wait at the anchorage area before entering the port. |
Time in feeder link | The time taken for transporting cargo between hub and feeder ports. This criterion is relevant only for hub and spoke networks. |