Skip to main content

Table 4 Overview of terminal side related input for the model.

From: Cold ironing: modelling the interdependence of terminals and vessels in their choice of suitable systems

Variable

Terminal

Source

Remark

CCMSt,x,term

668,000 €

PoR confidential quotations, hence only totals are presented

Reel midship

713,500 €

Reel Aft

734,000 €

Loading Arm

694,500 €

Floater

845,500 €

Crane and Reel

Cgrid + CEhouse + Ccables + CEng

1,590,500 €

PoR confidential quotations, hence only totals are presented

2,0 MW is assumed so the system is ready for a maximum of 2 connected CMS

fCMS,x

1

User input

This is related to the chosen CMS, however in this case all ships can share the aft located connections

fdir,x

0.95

Estimate

Based on an estimate of pilots 5% are not able to dock in the requested direction

Utilityship

0.25

User input

This is a starting value (based on port calls), that can be adjusted to the shipside model results, ranging between 0.00–1.00

Visterm,n,ship

200 per year

Port calls data PoR

Chemical – Shortsea

 

38 per year

 

Chemical—Parcel

Pship,n

1.15*1155 kW

(Clarkson 2021)

1 CMS installed (Max average plus 15%)

 

1.15*660 kW

 

2 CMS installed (Weighted average plus 15%)

Cmaint

2,000 €/year + 2,000 €/year per CMS

Estimate

Based on quotations

CE-fixed

2760 €/year

(STEDIN 2021)

 

CE-Cap + CE-MCap

52.50 €/(MW*year)

(STEDIN 2021)

 

CE-del

8.20 €/MWh

(STEDIN 2021)

Â